Complete Cost, EMI Options & Monthly Savings Guide - Perfect for 3-4 BHK Homes
Rs 3,00,000
System Cost
Rs 1,08,000
UP Subsidy
Rs 1,92,000
You Pay
Rs 3,200
EMI/Month
System Cost
₹3,00,000
Subsidy (UP)
-₹1,08,000
You Pay
₹1,92,000
EMI (60 mo)
₹3,200/mo
600
Units/Month
₹4,800
Monthly Savings
3.3 yrs
Payback Period
25-year savings: ₹14,40,000 | CO2 reduced: 7.5 tons/year
The 5kW solar system has emerged as the most popular choice for residential installations in Varanasi. It offers the perfect balance between cost, space requirements, and power generation - making it ideal for medium to large homes with monthly electricity bills between Rs 3,000-8,000.
A 5kW system in Varanasi generates approximately 20-22 units of electricity per day, translating to 600-650 units monthly. This is sufficient to power:
| Solar Panels (545W x 10 nos) | Rs 1,40,000 |
| Solar Inverter (5kW) | Rs 55,000 |
| Mounting Structure (GI) | Rs 35,000 |
| Wiring, ACDB, DCDB, Earthing | Rs 25,000 |
| Installation & Labor | Rs 25,000 |
| Net Metering Charges | Rs 20,000 |
| Total Cost | Rs 3,00,000 |
| PM Surya Ghar Subsidy | - Rs 1,08,000 |
| Your Final Cost | Rs 1,92,000 |
We offer flexible financing options to make solar affordable:
| Tenure | EMI Amount | Interest | Total Payment |
|---|---|---|---|
| 24 Months | Rs 8,800 | 12% | Rs 2,11,200 |
| 36 Months (Best) | Rs 6,200 | 12% | Rs 2,23,200 |
| 48 Months | Rs 4,900 | 12% | Rs 2,35,200 |
| 60 Months | Rs 4,100 | 12% | Rs 2,46,000 |
Tip: With monthly savings of Rs 4,800, solar essentially pays for itself even during EMI period!
A 5kW solar system requires approximately 300-350 square feet of shadow-free rooftop area. This is roughly the size of a medium bedroom. The space utilization depends on:
Based on actual customer data from Varanasi installations:
Daily Generation
20 units
Monthly Generation
600 units
Monthly Savings
Rs 4,800
Annual Savings
Rs 57,600
Payback Period: At Rs 57,600 annual savings, your investment of Rs 1,92,000 pays back in just 3.3 years. After that, you enjoy 22+ years of free electricity!
A 5kW residential installation in Varanasi typically takes 15-20 days from confirmation to commissioning:
5kW systems require minimal maintenance: